Synergy 21 LED Tube T8 SL series 120cm, cool white high power
- stock: 0
- part no.: 136967
- vendor: Synergy 21 LED
- mnufacturer no.: S21-LED-BS00072
- EAN No.: 4038816061874
- weight: 0.4kg
- warranty: 24 months
- Do you have any questions concerning this product?
Downloads
data sheet DE data sheet EN EU RoHS und REACH ErklärungLED Tube (tube)
powered from one side
Power consumption: 20 Watt
Lumen: 170lm/W, 3400 LM
Input: 100-240VAC, 50/60HZ
Light colour: cool white
Kelvin: 6100K ±250
CRI: >80
Beam angle: 140°
Length: 1200 mm
Diameter: 26 mm
Base: T8
Material: Polycarbonate (frosted glass look)
Operating temperature: -0°C ~ 45°C
Energy efficiency class: A++
kWh/1000h: 20
5 year guarantee
IES files available on request
Produktmerkmale:
Abstrahlwinkel: | 140 |
Betriebstemperatur: | -1 bis +45 |
CRI: | >80 |
Dimmbar: | Nein |
Grösse: | 1200*26 |
LED - Gehäusefarbe: | silber |
LED - Gehäusematerial: | PC |
Lichtfarbe: | kaltweiss |
Lichtfarbe in Kelvin: | 6100 |
Lumen: | 3400 |
Schutzklasse: | IP40 |
Sockel: | T8 |
Volt: | 230 |
Watt: | 20 |
Energieeffizienz Klasse B | |
---|---|
kwh/1000h: | 20,00 |
Lumen: | 3400 |
Watt: | 20,0 |
Nennlebensdauer: | 35000 Std. |
Schaltzyklen: | 50000 |
Opt. Umgebungstemperatur: | 25 °C |
EEK Label | Download |
Herst.Art.Nr.: S21-LED-000378
Herst.Art.Nr.: S21-LED-000502
Herst.Art.Nr.: S21-LED-000501
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-G00032
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-000518
Herst.Art.Nr.: S21-LED-000520
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: s21-led-000643
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-000802
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-000803
Herst.Art.Nr.: S21-LED-000979
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-000981
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-000990
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: EBN-OS /230
Ready to ship today,
Delivery time appr. 1-3 workdays
Herst.Art.Nr.: S21-LED-001253
Ready to ship today,
Delivery time appr. 1-3 workdays